LUMIROY factory floor with assembly lines for solar, wall and ceiling lighting

Manufacturing Capability

Manufacturing ExcellenceFrom Component to Certified Product

Forty thousand square metres, eight production lines and a 48-hour aging programme. Every fixture is traced, electrically tested and documented before it leaves our floor.

40,000m²
Facility area
8
Production lines
15+yrs
In lighting manufacturing
~110,000
Units per monthest. from ~5,000 / day
4
Export regionsEU · UK · AU · NA
—
Team membersto be confirmed

98.5% on-time delivery  ·  1,000-unit MOQ  ·  30 days sample to production

Process

From Incoming Materials to Sealed Carton

Six controlled stages, each with a named owner and a signed record. Stages partly overlap — total PO-to-FOB is 25–30 days for standard SKUs.

  1. 01

    Material Prep & IQC

    Time3–5 d
    OwnerIQC inspector
    RecordQP-__
  2. 02

    SMT & PCB Assembly

    Time5–7 d
    OwnerSMT operator
    RecordQP-__
  3. 03

    LED Module Assembly

    Time3–4 d
    OwnerModule technician
    RecordQP-__
  4. 04

    Final Assembly

    Time4–6 d
    OwnerAssembly operator
    RecordQP-__
  5. 05

    Aging & Electrical Test

    Time48 h
    OwnerQC engineer
    RecordQP-__
  6. 06

    Packing & Ship Prep

    Time2–3 d
    OwnerPacking supervisor
    RecordQP-__

Stage durations are for a standard SKU order and run partly in parallel. Record-form codes (QP-__) are placeholders — replace them with your actual document numbers.

Production

Production Lines

SMT placement heads mounting LEDs onto circular LED boards

SMT & PCB Assembly

High-speed SMT placement with AOI inspection after every cycle. Lead-free reflow soldering. Daily sub-assembly capacity: 15,000 PCBs.

  • High-speed placement machines
  • AOI inspection after every placement cycle
  • Lead-free reflow soldering
  • Daily sub-assembly capacity: 15,000 PCBs
Automated nozzle placing a lens onto an LED board during module assembly

LED Module Assembly

Semi-automated LED mounting and lens attachment. Thermal paste application controlled to ±0.1 g tolerance. 100% electrical test before module leaves station.

  • Semi-automated LED mounting
  • Thermal paste: ±0.1 g tolerance
  • 100% electrical test
  • Barcode traceability at every station
Workers hand-packing solar spotlights into printed retail cartons at the assembly and packing station

Final Assembly & Packaging

Manual assembly and packing stations for mixed product families. Torque-controlled screw-driving, then hand inspection before cartoning. Retail cartons and labels printed to your artwork.

  • Manual assembly & packing stations
  • Torque-controlled screw-driving
  • Hand inspection before cartoning
  • GS1-128 and country-specific label formats

Quality

In-House Quality Laboratory

Every fixture is aged and electrically tested; photometric verification runs on sampled units. Test parameters are recorded and shipped with the order.

LUMIROY testing laboratory entrance with 48-hour aging racks and in-house test equipment
On-site lab — 48h aging, photometry, environmental and EMC screening Results recorded per batch, filed against every order
Long-term aging test racks with illuminated fixtures in a dark chamber

48-Hour Aging Test

All fixtures run at rated voltage + 10% for 48 hours in a 45°C ambient chamber. Colour shift (Δuv) and lumen maintenance recorded. Failures are dissected, not shipped.

Technician operating a 2-metre integrating sphere with spectral data on screen

Photometric Verification

2-metre integrating sphere with spectroradiometer. Measures luminous flux (lm), CCT, CRI, R9, TM-30 Rf/Rg. Test report included with every shipment.

IP65/66 water spray test chamber with jet nozzles testing LED fixtures

Environmental Testing

In-house IP65/66 spray and dust chambers. Thermal cycling: -20°C to +60°C, 10 cycles. Salt spray: 500 h per ASTM B117 for coastal applications.

EMC pre-compliance laboratory with test benches and spectrum analysers

EMC & Safety Pre-Test

Pre-compliance screening for CE (EN 55015, EN 61000) and SAA (AS/NZS CISPR 15). Reduces third-party certification cycles by 40%.

Capacity

Capacity & Delivery Data

8Shared production linesFlexibly scheduled across solar, wall and ceiling lighting. No line is dedicated to a single category.
30 dPO to FOB shipmentAverage for standard SKUs. New designs: 45–60 days.
~5,000Units per dayFinished-goods output across all lines, varying with product mix.
1,000Units MOQStandard OEM customisation. Deep customisation starts at 5,000 units. Sample orders: 2 units.
Production stageDurationNotes
PO confirmation & material prep3–5 daysLong-lead items (ICs, custom optics) pre-ordered based on forecast
SMT & PCB assembly5–7 daysParallel with housing production
LED module assembly3–4 daysIncluding 48 h aging test
Final assembly & testing4–6 days100% electrical test + photometric spot-check
Packaging & shipping prep2–3 daysCustom packaging adds 1–2 days
Total (standard SKU)25–30 daysFOB Shenzhen/Yantian. Sea freight: +25–35 days to Europe/Australia.

Compliance

Certifications & Compliance

Seven credentials covering social compliance, EU/UK safety, energy efficiency, hazardous substances, and Australian / North American market access.

CredentialStandards coveredMarketStatus
BSCIamfori social complianceamfori BSCI Code of Conduct; social & ethical auditEU & global retailValid
CEEU conformityLVD 2014/35/EU · EMC 2014/30/EU · RoHS 2011/65/EUEU / EEAValid
ErPEcodesign(EU) 2019/2020 · (EU) 2021/341 · energy labellingEUValid
RoHSRestricted substances2011/65/EU · (EU) 2015/863 · IEC 62321 seriesEUValid
SAAAustralian approvalAS/NZS 60598.1 · 60598.2.x · 61347 · CISPR 15Australia / NZValid
UKCAUK conformityBS EN 60598 · BS EN IEC 55015 / 61547 / 61000Great BritainValid
ULNorth AmericaUL 1598 (luminaires) · UL 8750 (LED equipment)US / CanadaValid

Full test reports, DoC & audit files

We release complete reports only to verified buyers. Tell us your market and project type, and our engineering team sends the certificate pack with the standards relevant to your order highlighted.

  • Certificate numbers and issuing bodies included in the PDF pack
  • Each copy is watermarked and issued to your company
  • Typical turnaround: 1 business day

See It For Yourself

Schedule a virtual factory tour with our engineering team. Walk the production floor, meet the QC lab, and ask the questions that matter to your project.

Tours available in English, German and French. NDA available before sharing proprietary process details.